As promised...the story of the rectangle of dirt left within the parking pad and what happened to it.
Weeks prior to the pouring of the concrete parking pad, The Colonel and I had decided on how we wanted the space to look. We wanted it a certain size and shape and we wanted a little rectangular area at the base of the steps to be made from a different material and not concrete. We purchased a few pavers then to see if they would be what we would want in that area when the time came to put something there.
At 11:00 AM, two weeks following the concrete pour, we took those few pavers and with the help of DSIL and Spud, decided on a pattern for the paver layout.

We all agreed that the above pattern would be best. We calculated how many pavers, bags of base material and sand we would need to complete the project. It would take us four trips to the local home improvement store to gather all of our materials.
We prepared the base for the pavers. First we had to rake and level the dirt. We needed to make sure that we had a gentle slope for water run off. Next we put down the base material and tamped it down to make sure we had a good solid base before moving on to the next step.




I had laid a large portion of the pavers and I (or really my knees) had had enough, so I passed the rubber mallet onto Spud who laid a few pavers so that I could take a break. I took back the mallet, laid more pavers until there were about three rows left. My knees balked again, so The Colonel took over the final rows of pavers.

Daylight was fading so DSIL held a light for The Colonel to see by.

When The Colonel came to the last row of pavers he had to measure and cut them down for a proper fit. DSIL made a few cuts too for The Colonel.


128 rectangle pavers
23 square pavers
19 bags of leveling sand
22 bags of base material
1 bucket of joint compound
Total cost in dollars, about 232
Being able to walk from the house to the car (or the car to the house), not get your shoes dirty and track it into the house.......Priceless!

It is beautiful!
ReplyDeleteMy kness hurt just from reading this, it turned out great you guys.